Shorepower – Plug In and Save

LEED Building contractors – electrification is worth points towards LEED certification. Here’s how…

Capture5“Install electrical vehicle supply equipment (EVSE) in 2% of all parking spaces used by the project. Clearly identify and reserve these spaces for the sole use by plug-in electric vehicles. . Parking spaces that include EVSE must be provided separate from and in addition to preferred parking spaces for green vehicles.

“The EVSE must:

  • Provide a Level 2 charging capacity (208 – 240 volts) or greater.
  • Comply with the relevant regional or local standard for electrical connectors, such as SAE Surface Vehicle Recommended Practice J1772, SAE Electric Vehicle Conductive Charge Coupler or IEC 62196 of the International Electrotechnical Commission for projects outside the U.S.
  • Be networked or internet addressable and be capable of participating in a demand-response program or time-of-use pricing to encourage off-peak charging.”

Read More

Leave a comment

Your email address will not be published. Required fields are marked *